Preconstruction

Find the expensive problems while they are still on paper.

Request a Bid

Overview

The cheapest place to solve a construction problem is in a conference room. We estimate, review drawings for constructability, test the schedule, and price alternates while everything is still a decision instead of a change order. Preconstruction is a fixed-fee service, credited against the construction contract if you build with us.

What's included

  • Conceptual, schematic, and detailed estimating
  • Constructability and drawing coordination review
  • Value engineering with priced alternates
  • Site due diligence and feasibility studies
  • Master schedule and long-lead procurement planning
  • Permit and entitlement strategy

How we run it

The way this work actually gets delivered.

01 Estimate

Real numbers from recent buyout data, not square-foot averages from a book.

02 Review

Drawings cross-checked discipline by discipline for conflicts before they become RFIs.

03 Test

Schedule and logistics modeled against the actual site, access, and utility constraints.

04 Decide

Alternates priced side by side so you can choose on cost, schedule, and life-cycle impact.

Related work

Preconstruction in the field.

Ridgeline Distribution Center

Ridgeline Distribution Center

Preconstruction — Industrial — Reno, NV

Value engineering cut $1.9M before construction documents were sealed.

Foundry Works Adaptive Reuse

Foundry Works Adaptive Reuse

Preconstruction — Commercial — Cleveland, OH

Structural defects found during probing, priced before contract signing.

FAQs

Questions we get on every preconstruction job.

What does preconstruction cost?

A fixed fee scaled to project size, credited in full against the construction contract if you build with us. You know the number before we start.

How accurate are your early estimates?

Conceptual estimates land within about 10% and detailed estimates within about 3%, because they are built from our own recent trade buyout data.

Is value engineering just cheaper materials?

No. It is priced alternates — systems, structure, sequencing, and finishes — presented with cost, schedule, and life-cycle impact so you make the call, not us.

Can you help before we own the site?

Yes. Feasibility studies, site due diligence, and order-of-magnitude budgets are common work for us during a purchase evaluation.

Do we have to build with you afterward?

No. The deliverables are yours and you can bid the job out. Most clients keep going with us because the estimate and the schedule were already tested.

What clients say

Owners who hired us for this scope.

They gave us a hard number in week two and never came back for more. The building was weather-tight before the first freeze, which nobody else was willing to commit to.

Dana Whitfield

VP of Real Estate, Ridgeline Logistics

184,000 SF delivered 3 weeks early

Design-build saved us four months of drawing ping-pong. One contract, one team, one person answering the phone when something needed a decision.

Tom Salvatore

Director of Facilities, Cannery Row Foods

Permit to occupancy in 11 months